sabreW4K3@lazysoci.al to United Kingdom@feddit.ukEnglish · 8 days agoSmart meters to cost the UK billions: 2G switch-off means replacing 12-13 millionwww.theregister.comexternal-linkmessage-square12linkfedilinkarrow-up121arrow-down11file-textcross-posted to: [email protected]
arrow-up120arrow-down1external-linkSmart meters to cost the UK billions: 2G switch-off means replacing 12-13 millionwww.theregister.comsabreW4K3@lazysoci.al to United Kingdom@feddit.ukEnglish · 8 days agomessage-square12linkfedilinkfile-textcross-posted to: [email protected]
minus-squaremjr@infosec.publinkfedilinkEnglisharrow-up3·8 days agoI think rail uses GSM-R, which is not the same as the general public GSM aka 2G.
minus-square9point6@lemmy.worldlinkfedilinkEnglisharrow-up3·8 days agoOh really, I thought GSM-R was very much based on 2G, and is/was subject to the same switch off dates I’m not gonna pretend I know loads about that though
minus-squareGhoelian@piefed.sociallinkfedilinkEnglisharrow-up2·8 days agoIt’s not the same as 2G, but it is based on 2G. That’s where the GSM part comes from.
I think rail uses GSM-R, which is not the same as the general public GSM aka 2G.
Oh really, I thought GSM-R was very much based on 2G, and is/was subject to the same switch off dates
I’m not gonna pretend I know loads about that though
It’s not the same as 2G, but it is based on 2G. That’s where the GSM part comes from.