• 0 Posts
  • 7 Comments
Joined 2 years ago
cake
Cake day: May 21st, 2024

help-circle



  • FWIW,

    wp:ZENN

    ZENN (Zero Emission, No Noise) is a two-seat battery electric vehicle that was produced by the ZENN Motor Company of Canada from 2006 to 2010, designed to qualify as a neighborhood electric vehicle (NEV). It had a range of up to 40 mi (64 km) and was speed-limited to 25 mph (40 km/h).

    …

    Production of the ZENN LSV ceased in March 2010, and service support and provision of parts ended on June 30, 2013.[2]

    …

    Although the company was headquartered in Toronto and manufactured in Saint-Jérôme, north of Montreal, the vehicle was first introduced in the United States. The regulatory regime in Canada was less hospitable. Federal regulations set up by Transport Canada to approve low-speed vehicles (LSVs) for public road use excluded the ZENN and other NEVs from Canadian roads.



  • I just read this:

    wp:Panama Canal#Planned Indio River Reservoir

    In response to severe drought conditions that significantly impacted the Panama Canal’s operations in 2023 and 2024, the Panama Canal Authority (ACP) announced plans to construct a 4600-hectare reservoir on the Indio River. The project aims to augment the canal’s water supply and ensure consistent operations amid increasing climate variability.[205] The reservoir, estimated to cost $1.6 billion, will include a dam and hold approximately 1.25 billion cubic meters of water. It is expected to provide water for up to 15 additional daily transits during the dry season and support over half of Panama’s population with drinking water.[206] This development followed a Panamanian Supreme Court decision in 2023 that redefined the legal boundaries of the canal’s watershed, enabling water projects like the Indio River reservoir to proceed beyond the traditional limits.[206]

    ​

    The project has also raised social and environmental concerns, as it would displace an estimated 2,000 people and submerge local villages. By 2024, the ACP had begun public consultations to explore mitigation strategies and compensation plans for affected communities.[207] As of March 2026, relocations of affected families was to start in 2027; construction was expected to begin in 2028 and complete by 2031.[208]